Maintenance Manual Table of Contents
Do it by the book!
- 1- General
- Pre-flight Inspection (coming soon)
- Transporting the Aircraft (coming soon)
- Cleaning the Aircraft (coming soon)
- Post-flight Inspection (coming soon)
- Storage (coming soon)
- Modifications (coming soon)
- Aerobatic Enhancement Kit (coming soon)
- 2- Main Rotor
- 3- Tail Rotor
- 4- Flight Controls
- Servos (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Disassembly (coming soon)
- Repair (coming soon)
- Assembly (coming soon)
- Installation (coming soon)
- Setup and Adjustment (coming soon)
- 4-in-1 Control Unit (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Disassembly (coming soon)
- Repair (coming soon)
- Assembly (coming soon)
- Installation (coming soon)
- Setup and adjustment (coming soon)
- Transmitter (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Disassembly (coming soon)
- Repair (coming soon)
- Assembly (coming soon)
- Installation (coming soon)
- Modifications (coming soon)
- Remove Transmitter Throttle ratchet (coming soon)
- Setup and Adjustment (coming soon)
- Gyro Gain (coming soon)
- Tail Rotor Proportional Mix (coming soon)
- 5- Airframe
- Canopy (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Landing Gear (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Battery Support Assembly (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Main Frame Assembly (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Tail Boom Assembly (includes Tail Rotor Gearbox Housing and Vertical Tail Support (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Modifications (coming soon)
- Training Gear (coming soon)
- Strengthening Landing Gear Strut-to-Skid Joint (coming soon)
- 6- Power Generation
- Main Motor (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- 9.6v 650mah NiMH Battery (coming soon)
- Inspection (coming soon)
- Removal (coming soon)
- Repair (coming soon)
- Installation (coming soon)
- Charging (coming soon)
- Battery Upgrades (coming soon)
- LiPo (coming soon)
- Charger Selection (coming soon)
- Modifications